Collection System Design 2: Metal Scrape

Posted by on April 12, 2019 
Filed under Uncategorized

On April 3rd…

On April 3rd, collection system design 1 was modified into design 2. Collection system design 2 is comprised of design 1 with  an extra stepper motor and two metal plates attach to the wood and bent in 45 degree angle. Team member Dean was in charge of placing and securing the two stepper motors. Team member Justin was responsible for assembling the bent metal plates and screwing it to the wood piece. Team member Harris was assigned assign for assembling and attaching the rod to the stepping motor.

Comments



Leave a Reply